Contract Discrepancies between ConnectWise and e-automate

Each time the ID964 Agreement sync runs, it updates the contract in e-automate to match the line items on the agreement invoice from ConnectWise. If an item exists on the contract but not on the invoice, it will be removed. If an item appears on the invoice but not on the contract, it will be added.

This process is designed to keep the billing amount in e-automate aligned with the amount billed in ConnectWise. However, certain issues can cause discrepancies between the two systems. The two main issues that you may run into are:

  1. The base rate shown on the e-automate contract does not match the invoice subtotal from ConnectWise. 
  2. The contract preview amount from e-automate does not match the invoice subtotal from ConnectWise. 

EA Base Rate different than CW Invoice Subtotal

Issue: The base amount on the contract in e-automate doesn't match the invoice amount from ConnectWise. Depending on the termination dates of canceled items, the amount that you see in the base rate box might not match the invoice amount from ConnectWise. Preview the next invoice in e-automate to see the actual amount that will be billed when the contract is invoiced.

Base Amount on the Contract:

The base rate on the EA contract is found on the installment based billing tab under the option to use equipment base rates

ConnectWise Invoice Subtotal (Total without Tax)

When matching billing amounts between EA and CW always use the invoice subtotal amount from CW as the tax amount from CW does not sync

 

Sometimes the base rate total doesn't update, but the invoice in e-automate will bill the correct amount. To verify, preview the next invoice:

Open the contract and click on the Messages tab (1) and uncheck the option to 'Require acknowledgement' (2)

In order to preview the next month's invoice in EA you'll need to first uncheck the Require acknowledgement option on the message tab of the contract

Save the contract once the box is unchecked.

Next, right-click on the contract and choose the 'Preview next invoice' option

Right click on the contract in EA and select the Preview next invoice option

Verify if the billing amount matches the invoice amount from ConnectWise:

On the contract preview check the sum of charges to verify it matches the subtotal from CW

 

EA Contract Preview Amount different from CW Invoice Subtotal

Issue: If the contract preview amount in e-automate doesn't match the ConnectWise invoice subtotal, it's likely due to prorated charges for items that were terminated. This can happen if the sync updated the contract with the same billing period multiple times, billing periods were skipped in e-automate, or older invoices from ConnectWise were synced accidentally. To fix this, review the terminated items and remove any prorated amounts. If needed, completely remove the item causing the discrepancy from the contract.

Invoice Amount on EA Contract: $6,897.50

Contract preview in EA showing the sum of charges to be billed for the month

Invoice Subtotal on CW Invoice: $6,775.00

 Subtotal amount on the CW invoice does not match what EA is set to bill

To correct, we need to review the terminated items on the contract and see if any of those are charging prorated amounts. On the Equipment/Item tab of the contract, uncheck the box for 'Show only current equipment':

On the Equpiment/Item tab of the contract in EA uncheck the option to Show only current equipment to view terminated items on the contract

You'll now see all items that have ever been on the contract. The icon in the far left indicates terminated items:

Items that have been previuosly terminated on the contract will show once the show only current equipment is unchecked. The icon in the first column indicates which items are terminated

Double-click on the terminated items:

Open the terminated item and click on the Proration settings... button next to the End base billing date

Click on the proration button to see the prorated amount calculated by e-automate:

The proration settings for the item will show what amount EA is charging for a prorated base amount

The $122.50 prorated amount accounts for the difference between the two invoices. In this case, the Off365Acc item was added during the May billing, removed in June, and then added back to the contract - causing e-automate to apply a prorated charge.

To correct, follow these steps:

  1. Uncheck the Auto-calculate prorated base amount
  2. Update the Prorated Base Amount to be zero.
  3. Uncheck the Bill immediately box.
To stop EA from billing a prorated amount for an item: uncheck the Auto calculate prorated base amount option, set the Prorated base amount to zero and then uncheck the option to bill immediately

Repeat this process for any prorated amounts that are being billed. In some cases, you'll need to click on the Proration settings button by the Start base billing date and the one next to End Base billing date.

Once the proration amounts have been corrected, preview the invoice amount again in e-automate and verify that the proper amount will be billed. If the terminated item on the contract has never been billed on the contract you can highlight the item and then click on the remove button to remove the item from the contract. Items that have been billed in e-automate can not be removed from the contract.

To remove an item from a contract in EA, highlight the item on the Equipment/Item tab and then click on the Remove button at the bottom. Items that have been billed in EA can't be removed from a contract

 

 

Was this article helpful?