Follow

ID953 Equipment Meters on Multiple Active Contract Meter Groups, Overview & Sample

ID953 finds equipment meters that are in meter groups on more than one active contract, so you can correct the setup before the meter bills twice or on the wrong contract.

Jump to a specific section by clicking a link

Overview | Samples | Variables | Alert Functionality | Best Practices & Tips | Related Alerts

 

Click to Subscribe

Overview

Overview

Each equipment meter should bill on one contract, in one meter group. When the same meter ends up on two active contracts, the customer can be billed twice for the same usage, or billed on the wrong contract. This can happen when a contract is replaced or renewed and the old contract detail is never ended, and it is easy to miss until an invoice is queried.

ID953 checks your active contracts and emails you a list of every meter that is in more than one meter group, showing each contract it is on. The alert repeats on every run until the contract setup is corrected, so nothing slips through.

 

Run Schedule: Monday afternoon

Type of Output: Email

 

*  *  *

Sample

Sample

The email lists each meter that is in more than one active contract meter group. For each meter it shows the customer, equipment number, model and meter type, with every contract the meter is on listed on its own line as Contract - Contract Type (Meter Group).

Sample output:

*  *  *

Variables

Variables

Variable W: Branch Number(s) - Enter the branch numbers to include. Leave blank to include all branches. (OPTIONAL)

Variable X: Contract Type(s) - Enter the contract codes to exclude. Leave blank to include all contract codes. (OPTIONAL)

 

*  *  *

Alert Functionality

Alert Functionality

1. ID953 looks at every meter in a contract meter group on your active contracts.

2. A contract only counts if the meter's contract detail has started and has not ended. A renewal set up ahead of time, with a future start date, is not counted until it starts.

3. Contracts with a contract code listed in Variable X are skipped.

4. Any meter that is counted more than once is included in the alert, for the branches chosen in Variable W. This includes a meter that appears twice in the same meter group, as that is also a setup error.

5. The email lists each flagged meter, with every contract it is on shown on its own line. Results are grouped by recipient, so each person receives one email listing their meters.

6. ID953 alerts on every run until the meter is in only one active meter group. It does not stop after the first alert.

 

*  *  *

Best Practices & Tips

Best Practices & Tips

1. To clear the alert, correct the contract setup: give the old contract detail an end date, or remove the meter from the meter group it should not be in. Once the meter is in only one active meter group, it stops appearing.

2. When you renew or replace a contract, end the old contract detail as part of setting up the new one. You can set up a renewal ahead of time; it will not be flagged until its start date.

3. If some of your contract codes are meant to share meters with another contract, list them in Variable X so they are not flagged.

4. If a contract you expected is missing from the alert, check whether its contract code is listed in Variable X, and whether its contract detail has a start date in the future.

5. No email means no meters were found in more than one active meter group.

 

*  *  *

Related Alerts

Related Alerts

N/A

 

*  *  *

Was this article helpful?
0 out of 0 found this helpful
Have more questions? Submit a request

0 Comments

Please sign in to leave a comment.
Powered by Zendesk